New Main Entrance for the WILO AG, Dortmund, Germany
Contract: 2004
Construction period: 2006 - 2008
Design: Eckhard Gerber
Project director/Project manager: Georg Kolendowicz
Project team: Stefan Lemke, Hans-Christoph Bittner, Juana Grunwald, Jörg Schoeneweiß, Keith Stoltenfeldt, Kathrin Valvoda, Simone Saul et al.
Gross area: 582 m²
Volume: 3.156 m³
A small hall with a filigree glass skin is inserted between the two office buildings, which have been inadequately linked so far. Stairways and a glass lift connect all five levels, while slightly sloped ramps bridge the different storey heights. At the same time a new prestigious entrance situation is generated.