Redesign of “Betenhof”, Dortmund
Conctract: 2004
Construction period: 2006 - 2006
Design: Eckhard Gerber
Project director/Project manager: Georg Kolendowicz
Project team: Stefan Lemke, Kathrin Valvoda, Rüdiger Ameling et al.
Client: Dortmunder Volksbank eG
The slightly sloping square has got a timber paving like an “urban parquet”. The diagonally subdivided square has been paved with incline and in the form of two terraces respectively. A coloured “carpet” from coated mastic asphalt connects the flanking streets. From this point of view the square dominating tower “Lighthouse” by Prof. Linn is in a row with the church towers of Reinoldi and St. Marien.
Back