The foundation for the planned extension building in the courtyard of the Katholischen Kliniken Emscher-Lippe GmbH (here short: KKEL) in Gladbeck are finished and the construction works can swiftly continue. From Tuesday 2017-11-08 to Saturday 2017-11-11 a total of 39 modules, with the help of a mobile building crane will float above the existing building and positioned and put together. The prefabricated and repeating modules with an integrated shower room allow a huge reduction of building time and with the precise prefabrication those modules grant a high quality building standard. This kind of building allows a god and swift extension possibility to increase the bed capacity. The building owner, the Katholischen Kliniken Emscher-Lippe GmbH (here short: KKEL) can open the premises at the beginning of 2018.


©Gerber Architekten