The small weighing house completes the central waste deposit. As a steel box under an oval concrete roof it visibly stands out against the design of the other buildings. It is circled by a band-like steel frame with a tin casing varnished in orange. In contrast to this, the longitudinal sides are made of sound insulated glass. The rest room and the storeroom are concealed behind closed elements.
Location | Gelsenkirchen |
Competition | 1ˢᵗ prize 1990 |
Construction dates | 1996 - 1999 |
GFA | 10.658 m² |
Gross Volume | 62.637 m³ |