Today at the CVUA-MEL (Chemical and Veterinary Research Office Münsterland-Emscher-Lippe begin the construction works of the new two-story extensional building. In light of the geographical and constructional situation, the new building connects to the existing building as a compact construction block with a bridge between the old and new area. In the future, additional laboratory-, office- and working spaces can be reached via the connecting way in the 1st floor and across the main entrance.
Find more information about the existing building here: CVUA-MEL
Photo: ©Gerber Architekten