• Start
  • Projects
    • Architecture
    • Landscape architecture
    • Interior Design
    • Urban design
  • Profile
  • News
    • News
    • Competitions
    • Press
    • Jobs
  • Contact
    • Contact
    • Dortmund
    • Hamburg
    • Berlin
    • Münster
    • Riad
    • Shanghai
  • Downloads
  • Jobs
endeالعربية‎‎中文
  • News
  • Competitions
  • Press
  • Jobs
15.07.2024

Allianz Park Stuttgart recognised with the Merit Award at the Chinese Real Estate Design Award 2024

Office complex with organic design receives Merit Award

The Chinese Real Estate Design Award (CREDAWARD) is an international architecture prize awarded in China that honours outstanding achievements and innovations in the field of real estate and architectural design. The award is presented to architects, design firms, developers and other professionals, setting global standards for the industry.

Our Allianz Park project in Stuttgart was honoured with the Merit Award as a remarkable example of pioneering property and architectural design. Covering an area of 170,000 square metres, this park creates a sustainable, user-friendly and modern office space for 4,500 employees.

The architectural design of the Allianz Park in Stuttgart is characterised by its innovative design and harmonious integration of different structures. A central solitary building is surrounded by organically shaped, lower ‘satellites’ that are connected underground. These structures have rounded floor plans that allow them to merge into an architectural unit. A horizontal glass façade envelops all the buildings and offers an unobstructed view of the surroundings. The park at the heart of the complex, with a 100-year-old oak tree, refers to the company’s rich history and its strength and reliability. At the same time, this natural monument marks the central main entrance, the plaza. The plaza serves as a reception hall and event floor, from where employees and visitors are distributed to the individual areas of use in the building. Allianz Park is being developed by Allianz Deutschland AG as part of a comprehensive sustainability concept. The aim is to achieve DGNB Platinum certification, supported by photovoltaic systems on the roofs, a geothermal system to utilise geothermal energy and concrete core activation to improve the indoor climate. Another key factor is the positive impact on the urban climate thanks to the decision to have several buildings at different heights and their staggered arrangement, which allows air to flow freely into Stuttgart city centre.

share this
page

27.06.2024

Architecture Day

Gerber Architekten guides visitors through building projects in Dortmund, Berlin and Göttingen

Once again this year, property developers throughout Germany are opening their doors to provide insights behind the façades of otherwise closed buildings. We are represented with three projects in three different federal states.

Our project managers will guide you through the following completed projects:

  • Energy centre (Sun. 30.06.2024, 11:00 am)
    Meeting Point: Adlerstr. 8, 44137 Dortmund, main entrance
  • Wohnen am Nikolausberger Weg (Sun. 30.06.2024, 11:00, 13:00 and 14:00 Uhr)
    Meeting Point: Nikolausbergerweg 140-144, 37075 Göttingen
  • Veterinary Centre for Resistance Research (Sat. 29.06.2024, 12:00 and 14:00 Uhr)
    Meeting Point: Robert-von-Ostertag-Straße 8, 14163 Berlin, main entrance

All events are free of charge and offer you a unique opportunity to learn more about the background and challenges of the respective projects.

Further information can be found on the official websites of the Chamber of Architects of the respective federal states.

Photos from left to right:

© Hans Jürgen Landes
© Thilo Rohländer
© Marcus Bredt

share this
page

18.06.2024

Hot cities: climate-resilient construction as the key to adaptation

Building methods for cities worth living in

Increasing urbanisation and climate change are causing cities to become hotter and hotter. These so-called “hot cities” pose a challenge, as extreme temperatures affect the quality of life of residents and put a strain on infrastructure. In the current issue of SOUQ magazine, Thomas Lücking explains how climate-resilient construction can be used to respond to this development.

Through climate-resilient construction, buildings and urban structures can withstand the effects of climate change and at the same time contribute to reducing heat islands. One example of this is the King Fahad National Library, which is characterised by an ornamental façade consisting of rhomboid-shaped textile sails. While traditional Saudi architecture often screens out natural daylight and sunlight and requires artificial lighting inside, the unusual façade structure specifically regulates the high levels of solar radiation. The roof zone is also part of the lighting system. It is equipped with narrow skylights and white plastic membranes that reflect direct sunlight and allow filtered daylight to flow into the interior in a controlled manner. Layered ventilation and floor cooling are particularly important for the interior. Only the lower three metres, which correspond to the actual occupied area, are kept at a pleasant temperature. Together with the square in front of it, the King Fahad National Library represents an unusual combination of traditional construction and climate and energy-sensitive design. You can read the full article here from p. 38 – https://www.ghorfa.de/de/publikationen/souq/.

share this
page

17.06.2024

Residential building on Tallinn’s coast honoured with recognition

Living in an urban neighbourhood by the sea

Gerber Architekten has designed 4 residential buildings for the former shipyard site in Tallinn, which are arranged along the water’s edge. Floor-to-ceiling glass surfaces create a flowing connection between the interior and exterior spaces and provide an unobstructed view of the coast, while a large esplanade in front forms a spacious recreational zone with a transition to the coastal landscape. The four building complexes are surrounded by an urban environment with a harbour, historic industrial architecture and a wide range of outdoor activities. The striking combination of glass surfaces with wood-panelled, closed wall sections enables the design of both open and discreet living situations in the stacked flats, which form open-plan living spaces.

share this
page

06.06.2024

Topping-out ceremony for the new building of the Saarland Chamber of Skilled Crafts

Focus on the future of the skilled trades

Photo: HWK Saarland

Gerber Architekten is delighted that the topping-out ceremony for the new Chamber of Skilled Crafts building was celebrated last Wednesday, 5th of June 2024. The new building, which is being realised in close cooperation with the Chamber of Skilled Crafts, represents an important step towards expanding the Chamber’s training and administration facilities.

The innovative construction project includes modern training rooms, workshops and administrative areas that are optimally tailored to the needs of tomorrow’s tradespeople. The new building will not only decisively improve the infrastructure of the Chamber of Skilled Crafts and set an example for the future of skilled crafts in Saarland. With its self-sufficient cubature, the new building supports Pingusson’s construction and opens up to the listed park area of the former French Embassy, with two inner courtyards providing insights into the Chamber of Skilled Crafts’ fields of work as glass showcases.

We would like to thank everyone involved for their commitment and support and look forward to the completion of the project.

share this
page

23.05.2024

Gerber Architekten in action for a good cause

Running together, helping a good cause: Gerber Architekten at the B2Run in Dortmund

On the 7th of May, the time had finally come: we took part in the B2Run in Dortmund and had a really wonderful day together. Almost a third of our colleagues took part and made the day a very special experience. It was great to see how many of us joined together at the start and mastered the 5.5 km running distance.

In addition to the run, there were many interesting activities and health-related information booths that we enjoyed exploring. However, our commitment to a good cause was particularly close to our hearts. On this day, we not only pushed our physical fitness, but also actively supported the fight against blood cancer. With our donation to the DKMS, we were able to make a significant contribution and make a difference.

The B2Run in Dortmund was not only a sporting highlight for us, but also a day on which we grew together as a team and did something good. We are proud of our achievement and are already looking forward to the next event! 

share this
page

15.05.2024

Foundation stone laid for new townhouse in Ahlen

Elegant and subtle in its intricacies

The foundation stone for the new town hall in Ahlen was laid on 13 May 2024 as the first phase of the new civic campus. This was preceded by a planning phase that involved the active participation of local residents. The structure of the elongated, angled building block responds to its special location between the Werse riverside promenade and Ahlen’s historic town wall. From the building, which is divided into sections of different heights, you can enjoy the view of the neighbouring city park and the historic old town. Mayor Dr Alexander Berger (2nd from right) particularly emphasised the energy efficiency and quality of the space and usage concept of the new building, which is designed to meet contemporary needs and is due to be occupied in 2026.

share this
page

03.05.2024

30 years of Harenberg City Centre

‘The Harenberg House is built philosophy’

Since its foundation stone was laid in 1992 and its completion in 1994, the Harenberg City Centre has been a permanent fixture in Dortmund’s cityscape. Over the three decades, the 19-storey tower block has become an unmistakable landmark at the entrance to the Union Quarter.

The building ensemble, consisting of a striking trio, is characterised by a special design. A slightly curved, 6-storey wing follows the course of the historic wall and is connected to a high-rise building via a glass hall. With this unmistakable silhouette, the Harenberg City Centre characterises Dortmund’s skyline. Its elegant façade design and flexible floor plans make it a versatile and functional building complex. Filigree, restrained and yet representative, it blends into the city centre with its forecourt. As a location for congresses and cultural events as well as an office building, the elegant Harenberg City Centre is a striking part of Dortmund’s architectural history.

share this
page

  • «
  • 1
  • …
  • 8
  • 9
  • 10
  • 11
  • 12
  • …
  • 54
  • »

© Gerber Architekten 2026

  • Dortmund
  • Hamburg
  • Berlin
  • Münster
  • Düsseldorf
  • Riad
  • Shanghai
  • Contact
  • Privacy Policy
  • Imprint
to top