Extension Chamber of Crafts, Dortmund

A new office building for the Dortmund Trades Association will be built on the existing educational centre site in the Ardeystraße in Dortmund. It is inserted between the western edges of the old buildings – the arrangement of differently cantilevered storeys defines the main visitor entrance. On the ground floor, direct links to the existing buildings are provided via the north and south entrances.

The offices are developed from 5m module types to ensure flexible arrangements that are responsive to the changing needs of office structures.

> Interior Design

 

The new office building for the Dortmund Trades Association is built on the existing educational centre site in the Ardeystraße in Dortmund. It is inserted between the western edges of the old buildings – the arrangement of differently cantilevered storeys defines the main visitor entrance. On the ground floor, direct links to the existing buildings are provided via the north and south entrances.

The offices are developed from 5m module types to ensure flexible arrangements that are responsive to the changing needs of office structures.

Location Dortmund, Germany
Design 2009
Construction 2013 - 2014
GFA 3.274 m²
GV 12.557 m³
Sie haben der Nutzung von Google Maps nicht zugestimmt. Bitte stimmen Sie der Nutzung von Google Maps zu, um die Karte anzuzeigen.